How to install the T-bolt hose clamp with spring


Time of Release:

2021-08-27

If the T-bolt hose clamp with spring is assembled on the welding plate before assembling, in order to determine the direction of the clamp, it is recommended to mark the fixing place first, then weld on the welding, insert the lower part of the pipe clamp body, and place it.

If the T-bolt hose clamp with spring is assembled on the welding plate before assembling, in order to determine the direction of the clamp, it is recommended to mark the fixing place first, then weld on the welding, insert the lower part of the pipe clamp body, and place it. The pipe that needs to be fixed. Put on the other half of the pipe clamp body and cover plate, and tighten them with screws. Never directly weld the bottom plate with the pipe clamp installed.

Wholesale T-bolt Hose Clamp with Spring products on sales
The spring-loaded T-bolt hose clamp with spring is mounted on the ground guide rail. The guide rail can be welded to the foundation or fixed with screws. Then the guide rail nut is pushed into the rail and turned 90 degrees, and the lower half of the tube clamp body is embedded in the nut. Put the pipe to be fixed, put the upper half of the pipe clamp body and the cover plate, and fix it with screws.
T-bolt hose clamp with spring are stacked and assembled. The guide rails can be welded to the foundation or fixed with screws. First install the upper and lower pipe clamp body, put the pipe to be fixed, and then put the upper half of the pipe clamp body. Fix it with screws and prevent it from rotating through the anti-loosening cover. Then install the second pipe clamp in the same way as above.
When assembling the elbow of the T-bolt hose clamp with spring, when assembling the elbow, it should be directly fixed with the pipe clamp on the front and back of the elbow. It is recommended that such a support point should be a fixed position.

关键词:

Cheap,T-bolt,Hose,Clamp,with,Spring,supplier(s),china,customized,T-bolt,Hose,Clamp,with,Spring,factory